This application for Tybrook Estates PUD, Phase 1A is a revision to the plat approved at the January 28, 2020 Planning Commission Meeting. It is a minor revision that adds a 10th single-family lot to the north side of 8th Street. A revision is being made to split Lot 31 into two lots.
Mr. Pollard will request Administrative Approval of the Final Development Plan for the duplex portion of this development. The Preliminary Development Plan had envisioned a development with only two phases. This phase is only a portion of what had previously been planned in the Preliminary Development Plan as Phase 1. The applicant now envisions four phases. Currently, the utility infrastructure for the first phase is nearing completion.
Being a Planned Unit Development (PUD), the duplex portion of the development will be governed according to the Final Development Plan, which will regulate setbacks, façade, parking and driving surfaces, landscaping, common spaces, etc. The Final Development Plan must be submitted before any building permits are approved by the city.
The entire 95-lot development (duplexes and single-family homes) will include a number of common tracts as well. Two Home Associations will be responsible for their respective tracts. Tract A will be the site of one of the development’s detention areas. Tracts B and C, along the Powell Road right-of-way, will be for landscaping/buffers and entry signs.
Details concerning landscaping, screening and building aesthetics will be specifically dealt with in the Final Development Plan and CC&R’s. An elevation, floor plan and photographs of sample homes for the PUD portion must be included with the Final Development Plan.
Public Improvements and Access:
Access to this first phase of the development will be from Powell Road. Half-street improvements, including sidewalk is needed for the development along a minor arterial.
Storm Water:
Tract A will be the site of one of the development’s detention areas. Its maintenance will be the responsibility of the required homes association
Utilities:
All utilities are available adjacent to the property.
Fire Protection:
A temporary 96-foot diameter cul-de-sac is needed at the west end of 8th Street.
Sanitary Sewer:
Sewer mains are available near the property.
Landscaping and Buffering:
According to Section 14-503-13 of the Unified Development Ordinance (UDO), all subdivided land, included in all residential districts, that abuts a minor arterial, or arterial street, either at right angles or parallel to the collector, minor arterial, must provide a 15-foot buffer area from the edge of the right-of-way line towards the interior of the property to be screened by either a six foot fence or wall with a low impact landscape screen located between the wall/fence and the street right-of-way line, or a berm at least three feet in height with a medium impact landscape screen planted on the street side of the berm (no fence/wall required).
A detailed landscaping plan, for the R-12 zoned portion of the property, has been included with the Final Development Plan.
Addressing:
Lots 23 through 32 should be addressed on the plat as, 21000, 21004, 21008, 21012, 21016, 21100, 21104, 21108, 21108, 21112 and 21116 E. 8th Street S. Lots 82 through 95 should be addressed as 20921/20923, 20925/20927, 20929/20931, 20933/20935, 20937/20939 (also for Lot 85, 21001/21003), 21005/21007, 21009/21011, 21013/21015, 21017/21019, 21103/21105, 21107/21109, 21111/21113, 21115/21117, 21119/21121 E. 8th Street S.
Historic and Archeological Sites:
There are no historic or archeological issues with this property.
Planning Commission Action: At its March 9, 2021 Planning Commission meeting, the motion for approval passed 7-0.