Council action is requested to authorize the City Manager to approve change order no. 1 to the engineering services contract with TranSystems Corporation for the Crysler Avenue Bridge over Union Pacific Railroad (UPRR) project (no. 112108) for an amount not to exceed $142,359.50; authorizing future minor change orders for an amount not to exceed $14,235.95. |
| | | | | | | | Recommendations:
Council approval is recommended. |
| | | | | | | | Executive Summary:
Approval of this item will issue change order no. 1 in the amount of $142,359.50 to the engineering services contract with TranSystems Corporation to include construction inspection services for the construction phase of the Crysler Ave Bridge over UPRR project (no. 112108). This project will replace the existing concrete bridge deck, make substructure repairs, and replace the existing sidewalk and bridge railing. |
| | | | | | | | Background:
The Crysler Avenue bridge over the Union Pacific Railroad was originally built in 1980, and is located just North of the intersection of S Crysler Ave. and W. Lexington Ave. Based on Missouri Department of Transportation inspections, the concrete deck has a poor condition rating. Damage consists of spalls and delamination, transverse cracking, and expansion joint deterioration. Several previous repairs have been completed to date. Recommendations from the inspection is to replace the bridge deck.
The project (no. 112108) is intended to replace the existing deteriorated concrete bridge deck and make substructure repairs as needed to improve the bridge to an acceptable level of service. This action would approve a change order to the engineering services contract for the construction inspection of these improvements.
TranSystems Corporation successfully completed the design for this project. City Staff recommend utilizing their expertise as construction inspectors for the construction phase of this project which will begin Summer 2023. |
| | | | | | | |
Fiscal Impact:
The fiscal impact to the City is $156,595.45. Expenses for the Crylser Ave Bridge over UPRR project (no. 112108) will be paid from deferred maintenance debt issuance funds, 2020-21 Adopted Budget, page 90, account number 112108-C-Debt-7011-5406.
|
| | | | | | | | Department: Municipal Services | Contact Person: Lisa Reynolds |
|
REVIEWERS: | Department | Action | Public Works Department | Approved | Finance Department | Approved | City Managers Office | Approved | City Clerk Department | Approved |
|
| | | | | | | |
Council Action: | Council Action: |
|
|